Browse Items (2 total)

  • Tags: Well workover

Production from highly paraffinic crude oil wells poses unique technical challenges such as poor flowability and paraffin deposition on the production tubing. Paraffin deposition increases the lift load on the pump, reduces pump efficiency, and…
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2